Connect
Work
About
Carter Stilley Mitigation Bank
Ecological engineering & construction administration for the first coastal stream mitigation bank in South Carolina.
North Fork Pacolet River Restoration
Hydraulic analysis and engineering design for bank stabilization and river training structures along one mile of the N.F. Pacolet River.
Soco Creek
Hydraulic analysis of a proposed bridge crossing to preserve ecological flows in a trout stream and side channel.
Turkey Creek
Channel rehabilitation for 800 linear feet of urban canal in Sumter, SC. Completed in 2010 in partnership with Burns Engineers, Inc.
All Souls Church
Renovation and green infrastructure retro-fit for an historic church in Washington, DC.
Echoview Fiber Mill
A LEED-Gold micro-textile facility completed in 2011. Recipient of the NC AIA Design Honor Award and COTE Award.
Rocky Fork
Bioengineering bank stabilization design of a trout stream flowing along the toe of a dam.
Tupelo Bend
A new LID office park on Johns Island
Fox Hollow
Award-winning "green" neighborhood project on James Island with New Leaf Builders.
Show More